您的浏览器禁用了JavaScript(一种计算机语言,用以实现您与网页的交互),请解除该禁用,或者联系我们。 [世界银行]:马托格罗索州学校基础设施管理和维护系统指南 - 发现报告

马托格罗索州学校基础设施管理和维护系统指南

公用事业 2026-08-10 世界银行 单字一个翔
报告封面

in Mato Grosso © 2025 International Bank for Reconstruction and Development / World Bank1818 H Street NWWashington DC 20433Phone: 202-473-1000Internet: www.worldbank.org This work is a product of World Bank staff with contributions from external researchers. The findings,interpretations, and conclusions expressed in this paper do not necessarily reflect the views of the WorldBank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy, completeness, or timeliness of the data included inthis work and assumes no responsibility for any errors, omissions, or discrepancies in the information, norresponsibility with respect to the use or non-use of the information, methods, processes, or conclusionspresented. The borders, colors, denominations, links/footnotes, and other information shown in this work donot imply any judgment on the part of the World Bank with respect to the legal status of any territory or theendorsement or acceptance of such borders. Citation of works authored by third parties does not mean thatthe World Bank endorses the views expressed by those authors or the content of their works. Nothing herein shall constitute or be construed or deemed to limit or waive the privileges and immunities ofthe World Bank, all of which are specifically reserved. Please cite the work as follows: World Bank (2025). Guidelines for the Management and Maintenance Systemof School Infrastructure in Mato Grosso. World Bank. Rights and permissions The material contained in this work is subject to copyright. As the World Bank encourages the disseminationof its knowledge, this work may be reproduced, in whole or in part, for non-commercial purposes, providedthat this work is given full attribution. Any questions about rights and licenses, including subsidiary rights, should be directed to World BankPublications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2625;E-mail: pubrights@worldbank.org. Cover Design: Hernán DamilanoTypesetting: Florencia Micheltorena Table of contents 1.Executive Summary............................................................................................................................................. 6 3.Basic Foundations of Asset Management....................................................................................................... 93.1. Asset Management Framework.................................................................................................................................113.2. Risk management and prioritization.......................................................................................................................193.3. Determination of Expected Service Life (VUE)....................................................................................................243.4. Depreciated Value Estimate...................................................................................................................................253.5. Climate Risk.................................................................................................................................................................26 4.Data Collection and Validation........................................................................................................................284.1. Classification of Data by Building System.............................................................................................................. 31 5.Maintenance Management System................................................................................................................ 335.1. Portfolio registration.................................................................................................................................................... 345.2. Corrective Maintenance (Unplanned)...................................................................................................................355.3. Preventive and Predictive Maintenance............................................................................................................... 375.4. Contracts and Financial Control.............................................................................................................................. 415.5. Key Performance Indicators - KPIs.........................................................................................................................42 6.Promoting Climate Resilience and Safety in School Infrastructure............................................................486.1. Promote inclusive PLEs..............................................................................................................................................536.2. Build resilient PLEs.....................................................................................................................................................536.3. Fostering Le