您的浏览器禁用了JavaScript(一种计算机语言,用以实现您与网页的交互),请解除该禁用,或者联系我们。 [美国国家电信和信息管理局]:介绍跨部门委员会会议 - 发现报告

介绍跨部门委员会会议

报告封面

Why FirstNet? The First Responder Network Authorityshall hold the single public safety wireless licenseand take all actions necessary to ensure the building, deployment, and operationof the nationwide public safety broadband network Overview Of Consultation Process Consultation is an iterative process, not a single event FirstNet will communicate the consultation processand necessary roles and responsibilities Consultation will focus on critical information and data Plan development will be iterative Consultation culminates with the creation of the stateplan Together, stakeholders and FirstNet will have engaged in a process thatprovides meaningful and thorough information for the state plans Wide Range Of StakeholderConsultation Defining the Process Initial Consultation–Baseline StateAnalysis (BSA) Getting Ready for Consultation Getting States Ready ForConsultation (cont.) •Consultation readiness checklist─FirstNet is developing a checklist for SPOCs to use as a guideline prior to consultation─Thischecklist’s topics are consistent with deliverablesrequired by SLIGP•Examples of consultation checklist items may include: Outreach and Education:Statewide outreach plan created Governance:Functioning governance body in place Large metropolitan area contact list builtTribe contact list builtRural contact list builtEstablished email list for all public safetyleadership in stateCalendar of existing state, regional, andnational public safety association events Date/time of next governance body meetingFormal relationships documented with state’stribes Assessment and Validation:User agencies identified / proposed Secondary users identified / proposedKey stakeholders with assets that could assist withthe network build out are identified Asset Identification & Selection(Aligned with SLIGP Phase 2) –Define minimum recommended attributes of assetsfor consideration (Coverage objective/ technicalcapacity/site access/operations/low cost)–Request data collection on available assets to beconsidered–Assess all assets (commercial and public)–Select assets based solely on best value tothe FirstNet networkCostLegal /regulatoryAccess /operationsTechnical capacity /minimum hardening Guiding Principles–Limit data collection to viable assets to save the state time/effort–Leverage assets to provide bettercoverage at a lower cost–Leverage assets to deploy quicker State RAN Design Process Key Steps –Multi-phase (preliminary/intermediate/critical design)reviews with state to refine designbased on identified priorities–Incorporate feedback andadditional data as it is collected(SLIGP Phase 2/RFP Process) Guiding Principles–Ensure on-going review/ refinement process with state–Jointly develop tradeoffs andpriorities State Operations –Leverage PSAC and others to discuss overall approach to:•Local control •Prioritization•Training•Security–Develop operations template with areas for input/customization–Develop system cost structure/business plan for statebased on preliminary RAN design and potential user base–Customize based on public safety stakeholder input Guiding Principle–Address areas of consultation required by law –Ensure state RAN design is supported by businessplanning and cost considerations Final State Plan State Plan Key Steps–Document proposed coverage and Requirements associated cost–Supply projected funding level–Provide final review opportunity bystate’sSPOC / governing body–Submit to the Governor •Completion of theRFP process•Details of proposedbuild-out in the state•Funding level for thestate Guiding Principles–Address areas of consultation required by law–Ensure public safety stakeholders havehad robust involvement before stateplan is presented Questions www.firstnet.gov