发布时间:2026-08-26 一、AI总结内容 一、核心业绩与进展 1. 2026年第二季度营收1620万加元,年初至今营收2550万加元;当季毛利润280万加元,年初至今毛利润310万加元;当季调整后EBITDA170万加元,年初至今调整后EBITDA120万加元。 2. 加拿大安大略、不列颠哥伦比亚省建筑市场持续竞争,但报价与订单表现向好;2025年初至2026年7月底,累计报价超1.76亿加元,同比2025年同期增长约10.7%;累计订单超4900万加元,同比2025年同期增长约45.4%。 3. 安大略省克林顿自动机器人制造设施已完成设备安装,处于调试阶段,预计2026年9月交付首批客户订单。 二、业务策略与未来规划 1. 推进有机增长,聚焦墙板制造,为客户提供涵盖屋顶、地板桁架、墙板的完整项目包,评估新增松木料、墙板安装服务的可行性,通过增加单订单销售额分散衰退压力。 2. 持续评估北美地区的收购机会,收购评估维度包括地理位置、业绩、增长潜力。 3. 克林顿自动机器人设施聚焦解决劳动力短缺问题,而非替代人工;该设施日常运营仅需2-3名操作人员,较传统7-8人配置大幅减少人力需求,且扩产仅需增配2名操作人员,大幅降低人力获取难度 。 三、行业与外部环境讨论 1. 加拿大安大略、不列颠哥伦比亚省建筑市场已触底,处于自主恢复状态;渥太华住房服务税减免等基建支持措施不会短期见效,长期影响将在2026年冬季及2027年初逐步显现。 2. 加拿大建筑行业存在劳动力短缺问题,需通过自动化、完整项目包等策略应对。四、风险与关注 1. 订单交付周期延长,部分订单或将延迟至后续季度交付。2. 年初至今毛利润同比下降,主要受2026年第一季度冬季天气及安大略、不列颠哥伦比亚省市场环境影响,公司正通过争取冬季工程、年内提升利润率对冲成本压力。3. 行业受天气、监管、审批等因素影响,施工存在延迟风险。 二、音频原文(转写) people are a shortage we have in the country. Madam, thank you. And maybe around government efforts to support or accelerate home construction,you talked about the HST relief. We've recentlyseen some announcements around infrastructure, for example, wondering between that and whateverother efforts might be in the pipeline, how impactful you expect this kind of support to be. they do and any initiative they take is really impa ctful. And one thing I've learned is that once you start paying more and more attention to the announcement, sometimes you get disappointed because it doesn't happen tomorrow morning. But I now want to notice is the bureaucratic system, isthe government or system, everything that they've got to go through the due process and the announcements they've made in the past and so forthand some of it has come into fruition. And it'sbecause even despite all the evidence we have, it Every five minutes you get a new thing about tariffs or whatever is out there in the world. It's a crazy world out there. understand The construction in Canada, in my opinion, the 2 biggestprovinces are Ontario and BC. It bottomed out, completely bottomed out, and there is no way to go up. and is recovering on his own strength Andjust in strength of all these small or big initiatives, the government is talking about the infrastructure that it has still really So there areall those conversations that in discussion to how. 是。 But it's not an overnight remedy that hey let'sinject billions of dollars and fix it overnightbecause everything happens overnight, it will disappear overnight too, so. I actually like it. It's brought a certain toughness and resilience to our business to. many, many businesses in Canada stuff like that. This is it. And because it'snot going to take care of it, it will make it happen. Thanks, Bonette. Maybe one last questionfor me and I'll get back to the queue just around Clinton and understanding the target for shipping in September and wondering if we can talk about how commissioning has progressed thus far. We know there were delays in actually getting theshipments, but now that the equipment is on site for a while has commissioning progressed as expected or any hiccups you'd call out. The commissioning is going as expected. It's a little bit of a slow and The hiccups or the bug fixing of the last stages that is happening right now, andit's just because every time you run an amazingmachinery and automation like that, it's three hundred feet, three hundred feet of long assembly, robotic automated line, and there are so manyswitches and stuff, and like anything else, youwill expect some bugs to be worked out, and we are going to all that last stages one here, one there, and stuff there, and it's. Any moment right now in September we will be producing orders there also. That's great. Congress, thanks on thequestions. I'll get back in the queue. Thank you. Thank you, Russell and Hattie. And the next question is from. Nick, Nick from A T B, you canproceed with your question, Nick. Thanks, my guys. How do you -- in the prepared remarks, I think it was in the press release you mentioned thatsome of the quoting and order activity was quite strong, but you're seeing some some terms getextended out such that if you have an order received this quarter, it might not be delivered inthat quarter. I'm curious if there's any change.in the nature of those contracts or the bid themselves they would see. you know i'd rather. thechange in the business or the change in the quality of what you are bidding on. It's really a.There is no. that is not. I don't know. There isany significant change. The one thing I know isthat. And you know it like usually in the pastin a operation when you have way overflow. And then you start juggling orders and you start doing everything to -- and you hope to somebody is going to bump their order because you are past capacity. But right now. because of capacity, theincrease of capacity annual orders are so in incomparison to each other And then when there isa bump or a delay in the construction -- and I guarantee you in construction business, Because of so many